TitleProduct

Automotive Air Conditioning Plastic Mold

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Beijing

  • Validity to:

    Long-term effective

  • Last update:

    2020-06-26 22:50

  • Browse the number:

    124

Send an inquiries
+
Guanjie(Zhejiang) Mould Co., Ltd
Contactaixin:

jukun(Mr.)  

Email:

telephone:

phone:

Arrea:

Beijing

Address:

Aoan Road, Xicheng Industrial Zone, Huangyan District, Taizhou City, Zhejiang Province

Website:

http://www.guanjie-mould.com/ http://jukun.cqmrac.com/

+

Product Details

Product Name

Automotive air conditioning plastic mold

Mold cavity

Single cavity design

Mold Parting

Stepped Parting

Mold material

DIN1.2738 and DIN1.2312 die steel

Glue feeding method

Hot runner multi-point injection

Ejection system

Cylinder ejection

cooling system

Multi-point cross short circulation system

Mold cycle (from blanking to test mold)

90 working days (except for special circumstances)

The plastic shell of the automobile air-conditioning unit has multiple structures and many assembly positions. Higher requirements are placed on the mold. The mold structure is relatively complex, and there are many sliding core-pulling mechanisms. The precision requirements of the mold are high. The company adopts stepped parting in the mold. Structure design. Compared with the traditional structural design, the stepped parting design has higher requirements on the strength of the mold. Correspondingly, the manufactured mold design concept is more advanced, and some defects of the traditional structure in the production process are better avoided, which greatly improves the production efficiency and product qualification rate for customers.


Mold quality inspection

1、Mold material quality control

—Die steel inspection (hardness, cracks, pore material defects)

—Inspection of standard mold parts (hardness, size, defect inspection)

2、Quality control of mold processing

—Design check (part design, mold design, including 2D drawing and 3D drawing)

—Check the 2D drawing of each part of the mold according to the size after processing

—Mold test (check mold operating conditions and T1 samples)

3、Make sure to follow and check every point required by the customer before shipping.


FAQ

Q: How long is the mold production cycle?

A: The total cycle of mold from blanking to mold trial is 40-65 working days (except for special circumstances), and each link is kept on file so that customers can understand the progress of the mold at any time.


Q: What is the payment method?

A: 1)TT or Wester Union for trial order

2)ODM, OEM order, 30% deposit, 70% copy of the bill of lading.


http://www.guanjie-mould.com/